Schaerbeek’s municipal swimming pool, Neptunium, was designed by architect Laurent Senterre and opened in 1957. Sixty years later, it required a major renovation to meet current safety and hygiene standards, as well as to improve its energy efficiency. The building is an example of 1950s modernist architecture, so its renovation had to respect this heritage.
The renovation, designed by architecture firm Altiplan, was entrusted to general contractor Strabag Belgium. It comprised several phases: asbestos removal, work on the concrete structures, waterproofing repairs, renewal of the electrical installations, and measures to save energy and improve comfort for swimmers.

Plans of the renovated swimming pool.
Asbestos removal was essential
“An asbestos survey was carried out by Fibrecount (the consultancy changed its name in 2014 and is now called Oesterbaai sa) in 2015,” explains Marianne Hiernaux, spokesperson for Beliris. “When work began in October 2017, the survey was updated so that an environmental permit application could be submitted to IBGE. Additional quantities of asbestos were discovered, particularly in the suspended ceilings of the plant rooms. These areas had not been accessible in 2015 because the swimming pool was still in operation. The additional quantities therefore had to be dealt with, and asbestos removal took longer than expected.”
Peter Nagels, Operational Manager at Oesterbaai: “Our consultancy offers a wide range of services relating to hazardous substances and materials. Among other things, we focus on asbestos surveys and inventories, advice and project management on construction sites.” Oesterbaai’s brief here was a standard one: a desk study based on existing plans and inventories, a site visit and identification, both visual and through sampling, of materials that might contain asbestos, and the preparation of a comprehensive inventory with plans and photographs. But ‘standard’ does not necessarily mean ‘risk-free’. “Asbestos removal involves certain risks,” acknowledges Peter Nagels. “That is why this work must be carried out by specialist contractors and in accordance with strict guidelines, as set out in the regulations. If all these measures are followed, the risk to workers is manageable.”
He concludes: “I would like to stress the need and importance of carrying out a proper asbestos survey. Many see it as an unnecessary extra cost, but it is better to include this cost in the price of the work at the start of the process than to face an asbestos problem when it is too late…”

Neptunium undergoing renovation.
A redesigned layout for a refreshed interior
The interior finishes will be renovated in keeping with the original architecture. In the case of the tiling, for example, areas where original tiles have been mixed with more recent replacement tiles will be made uniform by salvaging materials dating from the original construction in the area due to be demolished. The small pool will be completely retiled. A monitoring system with underwater and aerial cameras will also be installed in the swimming pool to help prevent drownings.
Better insulation and energy-efficient heating
The façades and roofs will be insulated to make swimmers more comfortable and improve the building’s energy efficiency. The main roof will be completely rebuilt, while the ancillary roofs will receive new waterproofing. The façades will be clad with thermal insulation and render. Some of the original metal frames with single glazing were replaced in 1997. The remaining windows on the side façades and in the stairwells will be replaced with aluminium-framed, double-glazed units. The glazed roof will also be modified.
The old heating system will be replaced with condensing boilers and the ventilation system will be renewed. Air dehumidification will be provided by a heat pump, which will heat the ambient air, pool water and some of the domestic hot water. Apart from a few specific technical interventions, the relatively recent pool water treatment systems will be retained.
Neptunium is due to reopen in mid-2020.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemePool design and construction
- SubjectProjects